皇『huang』冠‘guan’开户平台www.hg9988.vip)是《shi》皇【huang】冠官方开户(hu)平台‘tai’,开放皇冠信「xin」用“yong”网代理《li》申〖shen〗请、信用网会员开户,线“xian”上投注的{de}官「guan」方平(ping)台。

,SCIB managing director/chief executive officer Rosland Othman

KUALA LUMPUR: Sarawak Consolidated Industries Bhd (SCIB) today clarified that its unit SCIB Properties Sdn Bhd (SCIBP) has been appointed as a sub-contractor to undertake an engineering, procurement, construction and commissioning contract in connection with the Integrated Smart Lamp Pole Replacement project for Kuala Lumpur City Hall (DBKL) by Ennova Sdn Bhd.

SCIB managing director/chief executive officer Rosland Othman said SCIBP’s scope of work included but was not limited to site clearing, excavation and reinforced concrete footing structure, laying all reinforcement concrete, bolts and nuts, and plates on all mild steel structures, with the poles, fittings and accessories to be supplied by Ennova.

ALSO READ: SCIB secures EPCC job worth RM31mil

"The scope includes perimeter chain-link fencing works, mild steel gates and setting up; earthworks, levelling, setting out, making point, and other related works; mechanical and engineering works such as wiring, switch boxes, connection to conduits, lay ground earth cable as well as installation of monopole,” he said in a statement today.

Rosland said Ennova was to bear all construction cost of the poles, including the rental of each erected pole in accordance with the agreed rental price between it and DBKL.

"We are unaware of any funding or financing arrangement for the contract by DBKL,” he added.

ALSO READ: DBKL not forking out any money for '5G street lamp' project

On Sunday, DBKL has denied appointing SCIB to replace 200 lamp posts in the Klang Valley as claimed.

This statement comes in the wake of reports that a contract worth RM30.75 million was awarded to the Sarawak-based precast concrete product maker via Ennova for the project. - Bernama


载说{shuo}明:本文转载自「zi」Sunbet。 Usdt自动充值接口声明:该文看法仅代表作者自己,与本平台无关。转载请注明:皇冠开户平台(www.hg9988.vip)_SCIB clarifies unit appointed as sub-contractor for DBKL works
发布评论

分享到:

欧博allbet网址(www.allbet8.vip_BAuto’s 4Q net profit up 18%, declares 4.5 sen dividend
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。